Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114
Blast and Paint SOC4 Facility - Triton Engineers

Blast and Paint SOC4 Facility

DETAILS

PROJECT LOCATION

San Diego, CA

PROJECT DATE

2009-07-30

KEY FEATURES

Consulting, Design, Planning, Construction Project Management

Project Overview

Triton engineered the design-build of three separate heavy production concrete slab foundations covering over 190,000 sqft concrete to support shipyard production in San Diego (CA) in conjunction GD NASSCO and the contractor, Marathon Construction

Value: $22,099,553