Design to replace an existing 285 lineal ft. of cellular steel piling with new steel sheet pile bulkhead wall and concrete cap. Work also included repair to concrete spalls at over 4000 lineal ft. of existing bulkheads.
Design to replace an existing 285 lineal ft of cellular steel pilng with new steel sheet pile bulkhead wall and concrete cap. Work also included repair to concrete spalls at over 4000 lineal ft of existing bulkheads.