Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114
Driscoll's Wharf Upgrade - Triton Engineers

Driscoll’s Wharf Upgrade

DETAILS

PROJECT LOCATION

Driscoll's Wharf, San Diego Bay

PROJECT DATE

2012-10-15

KEY FEATURES

Consulting, Design, Planning, Construction Project Management

Project Overview

Triton Engineers completed upgrades to Driscoll’s Wharf deck with no new piles through the innovative design of a prefabricated steel bridge to replace deteriorated pile bents. 

The improvements designed by Triton Engineers helped save the Port of San Diego thousands of dollars in project and construction costs.