Triton Engineers completed upgrades to Driscoll’s Wharf deck with no new piles through the innovative design of a prefabricated steel bridge to replace deteriorated pile bents.
The improvements designed by Triton Engineers helped save the Port of San Diego thousands of dollars in project and construction costs.