Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /users/tritonengineers.com/htdocs/wp-includes/functions.php on line 6114
Pier 4 & Bulkhead - Triton Engineers

Pier 4 & Bulkhead

DETAILS

PROJECT LOCATION

San Diego, CA

PROJECT DATE

2015-03-15

KEY FEATURES

pier 4, shipyard, repair, concrete, pilings, bulkhead

Project Overview

A new 420 ft long by 64 ft wide pile supported reinforced concrete pier and 600 ft of steel sheet piled bulkhead, mooring dolphin, fender system and utilities to support repair and maintenance of Navy ships. Construction cost was $20 million.

NEEDS CONTENT – WHAT DID TRITON DO??